Post-construction cleaning checklist

A room-by-room checklist to inspect a construction clean against, so a handover either passes or gives you a specific list of what to fix.

A handover inspection that produces the note "not clean enough" helps nobody. This checklist exists so an inspection produces a specific, closeable list instead.

Walk it in daylight. Construction residue on glass and polished surfaces is close to invisible under site lighting and obvious under sun.

Throughout the building

  • Glass: no film residue, no adhesive, no paint specks, frames and tracks clear of debris.
  • Horizontal ledges: door tops, skirtings, window sills, exposed pipework, all dust free.
  • Floors: correct finish for the material, no grout haze, no adhesive, no scuffing from the clean itself.
  • Switch plates, sockets, door furniture and handrails wiped and free of paint overspray.
  • Vents and diffusers free of construction dust, both the visible face and the blade edges.
  • Light fittings clean and free of dead insects and dust.
  • No stickers or manufacturer labels remaining on any fixture, appliance or pane.

Kitchens and bathrooms

  • Appliance interiors clean and packaging fully removed, including transit bolts and foam.
  • Cabinetry clean inside, including drawer runners, shelf edges and the tops of wall units.
  • Sanitaryware free of grout haze, sealant smears and protective coatings.
  • Tapware and shower screens free of water marks and mineral residue.
  • Extract fans clean and running.

Before you sign off

  • Confirm whether a touch-up clean is still to come, and if so do not measure against a final standard yet.
  • Photograph anything you are rejecting, with the location noted.
  • Give a written list with a date rather than a verbal comment.
  • Check whether re-cleans are included in the contract before you request one.